Details for Draft Alternatives Evaluation Report Update – June 2013

PropertyValue
Name:Draft Alternatives Evaluation Report Update – June 2013
Description:

This presentation updates the Board of Directors regarding progress to determine alternatives that terminate the NPDES permit by installing an additional treatment system for the plant’s process water (i.e. waste washwater). The new system will separate the process water liquid from the solids. The liquid will be returned continuously to the head of the treatment plant for reuse. The solids will be thickened and dried periodically and disposed of at the local landfill. The presentation discusses the components and schematics for the feasible alternatives being considered, construction costs for each alternative, changes to the scope and cost of the project, and schedule.

Filename:LEE-ROProcessRecyclePowerpointBdMtg062713.pdf
Filesize: 1.31 MB
Filetype:pdf (Mime Type: application/pdf)
Created On: 07/27/2016 13:04
Viewers:Everybody
Last updated on: 07/29/2016 09:19
Homepage:
CRC Checksum:
MD5 Checksum: