Details for  Pilot Study Results - Detailed Report - May 2015

PropertyValue
Name: Pilot Study Results - Detailed Report - May 2015
Description:

The Paradise Irrigation District (PID) water treatment plant (WTP) requires new waste washwater processing capabilities because of increased stringency in NPDES discharge regulations. Waste washwater from the plant includes upflow clarifier flush water, filter backwash water, and filter-to-waste water. This report summarizes testing conducted at the WTP to demonstrate the lamella plate settling / thickening process. The pilot testing demonstrated that the process performs well for the application of treating waste washwater for recycling at the PID WTP.

Filename:PID_PilotReport_AECOM-Final-May20_full.pdf
Filesize: 6.48 MB
Filetype:pdf (Mime Type: application/pdf)
Created On: 05/03/2016 08:35
Viewers:Everybody
Last updated on: 05/05/2016 07:34
Homepage:
CRC Checksum:
MD5 Checksum: