Details for  Constructed Wetlands Evaluation Report - March 2014

PropertyValue
Name: Constructed Wetlands Evaluation Report - March 2014
Description:

Lee & Ro completed an Alternatives Evaluation Report in March 2014 that examined alternatives to upgrade the water treatment plant (WTP) waste washwater collection and holding ponds to return the settled water to the inlet to the WTP for blending with its raw water supply.

 

Brown and Caldwell was retained by Lee & Ro, Inc. in December 2013 to evaluate a constructed wetlands alternative for the treatment and recycling of waste washwater from Paradise Irrigation District’s (PID) water treatment plant. This report provides an evaluation of a wetlands alternative that PID will consider along with the other alternatives developed by Lee & Ro.

Filename:Constructed Wetlands_PID Final Report_032014_Rev 2.pdf
Filesize: 1.81 MB
Filetype:pdf (Mime Type: application/pdf)
Created On: 11/10/2015 12:28
Viewers:Everybody
Last updated on: 07/29/2016 09:24
Homepage:
CRC Checksum:
MD5 Checksum: